Busby Street Bathroom Pods.

Busby Street Bathroom Pods

This project was for a development of two, three storey walk-up apartment blocks with a total of 18 2-bedroom units and 18 prefabricated bathroom pods. 

Concision supplied all 18 pods, consisting of 6x accessible and 12x universal design based on Kainga Ora’s requirements. The pods were fully finished on the inside and had electrical wiring and plumbing installed to predefined connection points.

The project was a ‘design-and-build’ where we were part of the design team to ensure maximum benefit of our prefabricated products was achieved. A highly detailed BIM model was developed which included all pod elements.

Other Projects

View more